Work Completed
Installation of the following –
2 x 50kw heat only boilers
Low loss headers
2 x 500L Calorifiers with destratification pumps
2 x break tanks
1 x booster set
![design-and-install-commercial-5](https://pure-mechanical.co.uk/wp-content/uploads/2023/05/design-and-install-commercial-5.jpg)
Installation of the following –
2 x 50kw heat only boilers
Low loss headers
2 x 500L Calorifiers with destratification pumps
2 x break tanks
1 x booster set